Banda Zone B1 & B3, located in Uganda, is a low-lying area characterized by informal and unplanned settlements. The main objective of this project was to assess the causes of the flooding in Banda Zone B1 & B3 and to establish flood mitigation and adaptation measures.
This project used a scenario approach in PCSWMM for estimating floods, taking into consideration the current state and the potential future scenarios of development in the area.
Integrated Flood Risk Mitigation and Management In Low Lying Urban Areas: A Case Study of Banda Slum Zone B1 & B3