Day 1: Introduction to PCSWMM and EPA SWMM5 modelling, ​hydrology and hydraulic considerations for mines, building a new stormwater model, importing and leveraging external CAD/GIS data, design storm creation using external data sources, rainfall disaggregation using a daily time step, error analysis and setting-up control rules to simulate a water balance.
Day 2: Groundwater aquifer parameterization, soil erosion estimates using the MUSLE equation, integrated 1D-2D modelling for pit, surface and canal flooding, flood risk mapping for mines, large-scale model calibration and flow duration curve analysis.
|